发表于 2016-7-5 12:40:46 | 显示全部楼层 |阅读模式 来自: 中国新疆乌鲁木齐
平时工作中是否为找孔探口的位置所发愁?现在给你们总结所有孔探口的位置和力矩值方便兄弟们工作!希望对你们有帮助!
QQ截图20160705124707.jpg
参考AMM72-00-00,仅作参考使用
S1-S6
1.png
Do these steps toinstall the S1-S6 borescope plugs:
(a) Apply a lightlayer of grease, D00601 [CP2101], pure nickel special compound, D50034[CP2619] or milk ofmagnesia compound, D50032 [CP1064] to the threads and to the friction surfaces of theplug.
(b) Install theplugs in the compressor case.
1) Tighten the plugto 57 in-lb (6.4 N_m)-63 in-lb (7.1 N_m).
(c) Put safetywire,G02345 [CP8001] or cable, G50065 [CP8006] on the plugs.
S7-S9
2.png
Do these steps toinstall the S7-S9 borescope plugs:
(a) Before youinstall the S7-S9 borescope plugs, make sure the inner borescope port is open as follows:
1) Put thecompressor borescope tool in the borescope port (Figure 606).
(b) Apply a light layer of these lubricants tothe borescope plug assembly as follows:
1) Apply pure nickelspecial compound, D50034 [CP2619], grease, D00601 [CP2101] or milk of magnesiacompound, D50032 [CP1064] to the threads and mating surfaces on the inner plug.
2) Apply grease,D00601 [CP2101], pure nickel special compound, D50034 [CP2619] or milk of magnesiacompound, D50032 [CP1064] to the threads of the outer plug.
(c) Install theborescope plug in the applicable borescope port and tighten as follows:
1) Tighten the innerplug to 76 in-lb (8.6 N_m)-84 in-lb (9.5 N_m).
2) Loosen the innerplug by one-quarter turn.
3) Tighten the innerplug again to the run-on torque plus 15 in-lb (1.7 N_m)-20 in-lb (2.26 N_m).
4) Push the outerplug to engage the threads in the compressor case.
a) Tighten the outerplug by hand.
5) Tighten the outerplug to 57 in-lb (6.4 N_m)-63 in-lb (7.1 N_m).
a) Attach all threeouter plugs together with cable, G50065 [CP8006] or safetywire,G02345 [CP8001].
S10-S11
The port for the 4:00 o’clock main igniter plug isreferred to as the S10 borescope port.
The port for the 8:00 o’clock main igniter plug isreferred to as the S11 borescope port.
S12-S15
Do these steps toinstall the borescope plugs:
(a) Lubricate thethreads of the borescope plugs with pure nickel special compound, D50034[CP2619], milk ofmagnesia compound, D50032 [CP1064] or grease, D00601 [CP2101].
(b) Install theborescope plugs.
1) Tighten eachborescope plug to 57-63 pound-inches (6.4-7.1 Newton-meters).
2) Installsafetywire, G02345 [CP8001] or cable, G50065 [CP8006] on each borescope plug.
3.png
4.png
S16-S17
- 5.png
BAV ALL PRE SB 737-CFM56-7B-0293
SUBTASK 72-00-00-430-010-F00
(6) Torque the plugs to 57 in-lb (6.4 N_m)-63 in-lb (7.1N_m).
(a) Install safetywire, G02345 [CP8001] or cable, G50065[CP8006].
BAV ALL POST SB 737-CFM56-7B-0293
SUBTASK 72-00-00-430-011-F00
(7) Torque plugs S16 and S17 to 57 in-lb (6.4 N_m)-63 in-lb (7.1N_m).
(a) Install safetywire, G02345 [CP8001] or cable, G50065[CP8006] on the borescope plugs.
(8) Torque theself-locking borescope caps assembly to 50 in-lb (5.6 N_m)-55 in-lb (6.2 N_m).
NOTE: To achieve thecorrect installation of the self-locking borescope cap assembly, the slot of its ring must bepositioned on the borescope boss lug at the final tightening.
S18-S20
6.png
(4) Do these stepsto install the borescope plugs:
(a) Apply grease,D00601 [CP2101] or pure nickel special compound, D50034 [CP2619] or milk of magnesiacompound, D50032 [CP1064] to the threads and friction surfaces of the borescope plugs S16,S17, S18, S19 and S20.
(b) Install S16 andS17 on the combustion case.
(c) Install S18,S19, and S20 on the LPT case.
BAV ALL POST SB 737-CFM56-7B-0293
SUBTASK 72-00-00-430-009-F00
(5) Do these stepsto install the borescope plugs:
(a) Apply grease,D00601 [CP2101] or pure nickel special compound, D50034 [CP2619] or milk of magnesiacompound, D50032 [CP1064] to the threads and friction surfaces of the borescope plugs S16and S17.
(b) Install S16 andS17 on the combustion case.
(c) Apply grease,D00601 [CP2101] or pure nickel special compound, D50034 [CP2619] or milk of magnesiacompound, D50032 [CP1064] to the threads of the self-locking borescope cap assembly S18, S19and S20.
BAV ALL PRE SB 737-CFM56-7B-0293
SUBTASK 72-00-00-430-010-F00
(6) Torque the plugsto 57 in-lb (6.4 N_m)-63 in-lb (7.1 N_m).
(a) Installsafetywire, G02345 [CP8001] or cable, G50065 [CP8006].
BAV ALL POST SB 737-CFM56-7B-0293
SUBTASK 72-00-00-430-011-F00
(7) Torque plugs S16and S17 to 57 in-lb (6.4 N_m)-63 in-lb (7.1 N_m).
(a) Installsafetywire, G02345 [CP8001] or cable, G50065 [CP8006] on the borescope plugs.
(8) Torque theself-locking borescope caps assembly to 50 in-lb (5.6 N_m)-55 in-lb (6.2 N_m).
NOTE: To achieve thecorrect installation of the self-locking borescope cap assembly, the slot of its ring must bepositioned on the borescope boss lug at the final tightening.

评分

参与人数 1机务币 +100 收起 理由
ljj + 100 我分享,我快乐!

查看全部评分

回复

使用道具 举报

3

主题

1699

帖子

516

积分

机务学徒工

Rank: 3Rank: 3

积分
516

实名认证

发表于 2016-7-5 23:49:01 | 显示全部楼层 来自: 中国广东深圳
学习了感谢分享
回复 支持 1 反对 0

使用道具 举报

4

主题

25

帖子

200

积分

见习机务员

Rank: 2

积分
200
发表于 2016-7-6 12:20:29 | 显示全部楼层 来自: 中国山东
楼楼哪儿的孔探啊

回复 支持 反对

使用道具 举报

11

主题

132

帖子

1322

积分

机务正式工-执照C

Rank: 5Rank: 5

积分
1322

实名认证

发表于 2017-11-23 14:49:51 | 显示全部楼层 来自: 中国河北石家庄
学习了,厉害
回复 支持 反对

使用道具 举报

1

主题

9

帖子

1

积分

试用期机务

Rank: 1

积分
1
发表于 2022-12-5 14:33:48 | 显示全部楼层 来自: 中国广东广州
楼主是做孔探的吗?有事请教一下。
回复 支持 反对